References
[1]. BIM Appliction Standard 2007 Based on IFC Standard published by the US National Institute of Building Sciences.
[2]. Li J 2009 Research on Key Technologies of Concrete Structure 100 Year Durabiliity of the National Stadium for Beijing 2008 Olympic Games Proc.of Shanghai Int. Conf. on Technology of Architecture and Stucture p 68.
[3]. Ma Z,Li H and Yang J 2014 Using XML to support information exchange in construction projects Autom. Constr. 12 pp 491-506.
[4]. Linderoth H 2010 Understanding Adoption and Use of BIM As the Creation of Actor Net works Autom. Constr. pp 66-72.
[5]. Eastman C, Teicholz P and Sacks R et al. 2000 BIM handbook New Jersey ohnWiley &Sons.
[6]. Zhang J and Hu Z 2011 BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:principles and methodologies Autom. Constr. pp 155-166.
[7]. Li Y, Lang H and Wu T 2013 Project Quality Management Based on Building Information Modeling Construction technology Technology 10(1) p 20-23.
[8]. YA and K 2011 Technology adoption in the BIM implementation for lean architectural practice Autom. Constr. pp 189-195.
[9]. Smith D and Tardiff M 2009 Building Information Modelling: a Strategic Implementation Guide for Architects, Engineers Constructors and Real Estate Asset Managers 25(1) p 99.
[10]. Ding L and Ying Z 2014 Burcu Akinci.Building Information Modeling application framework The process of expanding from 3D to computable Autom. Constr. 24(2) pp 82-93.
[11]. Ma Z,Wei Z and Wu S 2011 Application and extension of the IFC standard in construction cost estimating for tendering in China Autom. Constr. 24(3) pp 96-204.
Cite this article
Wang,B. (2023). Study on the application of construction project cost control in China. Applied and Computational Engineering,24,105-112.
Data availability
The datasets used and/or analyzed during the current study will be available from the authors upon reasonable request.
Disclaimer/Publisher's Note
The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of EWA Publishing and/or the editor(s). EWA Publishing and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.
About volume
Volume title: Proceedings of the 2023 International Conference on Functional Materials and Civil Engineering
© 2024 by the author(s). Licensee EWA Publishing, Oxford, UK. This article is an open access article distributed under the terms and
conditions of the Creative Commons Attribution (CC BY) license. Authors who
publish this series agree to the following terms:
1. Authors retain copyright and grant the series right of first publication with the work simultaneously licensed under a Creative Commons
Attribution License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this
series.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the series's published
version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial
publication in this series.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and
during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See
Open access policy for details).
References
[1]. BIM Appliction Standard 2007 Based on IFC Standard published by the US National Institute of Building Sciences.
[2]. Li J 2009 Research on Key Technologies of Concrete Structure 100 Year Durabiliity of the National Stadium for Beijing 2008 Olympic Games Proc.of Shanghai Int. Conf. on Technology of Architecture and Stucture p 68.
[3]. Ma Z,Li H and Yang J 2014 Using XML to support information exchange in construction projects Autom. Constr. 12 pp 491-506.
[4]. Linderoth H 2010 Understanding Adoption and Use of BIM As the Creation of Actor Net works Autom. Constr. pp 66-72.
[5]. Eastman C, Teicholz P and Sacks R et al. 2000 BIM handbook New Jersey ohnWiley &Sons.
[6]. Zhang J and Hu Z 2011 BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:principles and methodologies Autom. Constr. pp 155-166.
[7]. Li Y, Lang H and Wu T 2013 Project Quality Management Based on Building Information Modeling Construction technology Technology 10(1) p 20-23.
[8]. YA and K 2011 Technology adoption in the BIM implementation for lean architectural practice Autom. Constr. pp 189-195.
[9]. Smith D and Tardiff M 2009 Building Information Modelling: a Strategic Implementation Guide for Architects, Engineers Constructors and Real Estate Asset Managers 25(1) p 99.
[10]. Ding L and Ying Z 2014 Burcu Akinci.Building Information Modeling application framework The process of expanding from 3D to computable Autom. Constr. 24(2) pp 82-93.
[11]. Ma Z,Wei Z and Wu S 2011 Application and extension of the IFC standard in construction cost estimating for tendering in China Autom. Constr. 24(3) pp 96-204.